The
tires are ground and all metals and fibers are removed.
Bagged
Labeled
The
crumb rubber is packaged in 2,000-lb. supersacks and shipped to
the contractor's asphalt plant.
Each
supersack is labeled with its exact weight and other pertinent information.
Lab
Blending
Mix
Design
Rubber-modified
liquid asphalt binder is made for the mix design in the lab by blending
crumb rubber with unmodified binder.
The
mix design is performed by ARTS staff
using SCDOT Superpave Mix Design procedures.
Hot
Mix Asphalt Plant
Blending
Unit
Little
or no modifications are required at the contractor's asphalt plant.
The
blending unit is utilized to make rubber-modified asphalt binder
at the asphalt plant.
Pumping
Dumping
The
blending unit is connected to a tanker that pumps unmodified liquid
asphalt binder into the blender.
Rubber
is added to the liquid asphalt binder.
Blending
Viscosity
Testing
Rubber-modified
liquid asphalt is blended and pumped into the hot mix asphalt plant.
The entire process takes about 45 minutes and makes approximately
6,500 gallons of rubber modified asphalt binder per batch.
ARTS
staff performs quality control viscosity testing on the rubber-modified
liquid asphalt at the hot mix asphalt plant during production.
Testing
Hot Mix Asphalt
Paving
The
contractor's lab technician performs quality control testing using
SCDOT procedures on the rubber-modified hot mix asphalt at the plant
during production.
Rubber-modified
hot mix asphalt is placed on the road using standard paving equipment.
Compaction
Finished
Pavement
Steel
wheel rollers are recommended, but rubber tired rollers may be used
for finish rolling.
Rubberized
Asphalt Pavement is generally more durable than conventional asphalt
pavement.